Satropot

PRESTRESSED GIRDERS REPAIR - SATTARI BRIDGE

Client
MUNICIPALITY OF TEHRAN

Location
TEHRAN, IRAN

Technical Information

Design and supervision of repair of the impact-damaged prestressed concrete girders (two girders) with length of about 28 m. The steps of the repair are briefly as follows:

  • Construction of temporary piers
  • Damage assessment of the girders
  • Preloading the girders that to need its (before repair) 

Duration
2013 - 2014