PRESTRESSED GIRDERS REPAIR - SATTARI BRIDGE
Client
MUNICIPALITY OF TEHRAN
Location
TEHRAN, IRAN
Technical Information
Design and supervision of repair of the impact-damaged prestressed concrete girders (two girders) with length of about 28 m. The steps of the repair are briefly as follows:
- Construction of temporary piers
- Damage assessment of the girders
- Preloading the girders that to need its (before repair)